Section 3 floor framework

 16/09/2021

Following on from yesterday's successful operation to remove the tempory cover from the carriage we followed up with a very productive day first fitting the framework of section 3 of the carriage. We were confident the section in isolation was 'good to go ' but until today we had not had the opportunity to see how well it fitted the existing bodywork. Well, by about midday just about all our fears were a distant memory and we were very happy with the outcome. The photographs show most of the woodwork in question with one or 2 small pieces omitted that still require final finishing. Because we can only mark the final fixing holes from underneath we will need to address that before final fixing can take place. We will then be able to erect the bodywork sides before tackling further roof hoop manufacture.

                                  

                       Sadly we have had to cover this work up to protect it from the elements

The final section sole plates were fitted and sawn to length 
so we have  at least reached the end in some small way.


The scarfing joints fitted together well.






Comments

Popular posts from this blog

Final dismantling underway

The End is Nigh................

What happens under the sheets......