07/04/2022 Easier with some floor to stand on................

Whilst we await our slightly overdue arrival in the shed we have been making the most of the sunny, if blustery weather to fit some of the flooring on to the newly assembled section base. A layer of 20mm tongue and groove is topped be 25mm plywood. The lower picture show the first section of ply being eased into place in lateral seating bay 3 and the under floorboards almost completed in the longitudinal seating bay adjacent to the entry vestibule. We're pleased with the progress after one or two minor hiccups to start. Watch out for more progress soon.



 