Yesterday saw the big push to get the forward partition permanently into place. A 3 dimensional jigsaw including top heavy pieces 9ft square and weighing 2-3cwt (3 mtrs and 125kilos for the metric minded) having to be manoeuvred into position then dropped vertically into place with no mechanical assistance proved quite a challenge. However, as you see below, we did succeed along with some more attention to the roof spacer timbers and the trial fit of all the doorway timbers that just need some further small fettling .