'Moving on' 07/09/2022

 Having caught our breath following the very busy Steam Fayre a few weeks back we have now started to fill the gaps on the body framework recently constructed. The 2 side rails that support the galvanised sheeting on the lower carriage sides have been made and fitted and work has also progressed in the workshop sorting and squaring the remaining uprights for the last section. We have established that we will need to obtain 4 more for the luggage end door jambs. 115mm x 90mm x1800mm so we'll be shopping for those before long.



Today we have also marked out and started drilling the first 2 of the 2mm galvanised side sheets
 for the 'railway' side of the carriage. About 60-70 holes on each sheet. The pilot holes are the easy ones


 

Comments

Popular posts from this blog

Final dismantling underway

The End is Nigh................

What happens under the sheets......