Posts

More progress to report 19/06/2022

Image
Yesterday saw the big push to get the forward partition permanently into place. A 3 dimensional jigsaw including top heavy pieces 9ft square and weighing 2-3cwt (3 mtrs and 125kilos for the metric minded) having to be manoeuvred into position then dropped vertically into place with no mechanical assistance proved quite a challenge. However, as you see below, we did succeed along with some more attention to the roof spacer timbers and the trial fit of all the doorway timbers that just need some further small fettling .

Getting there.......................16/06/2022

Image
We're getting towards the end of our  undercover period and whilst we may not have achieved absolutely everything we had hoped for we have made good progress having also encountered a few unforeseens, what railway project doesn't? Not least discovering the top of the Luggage end entrance vestibule partition had a broken joint which required some serious dismantling that we hadn't planned for. See pictures  below. However today we came within a 'stones throw' of refitting the Drivers side  entrance vestibule partition along with many of the roof supports that fit between the hoops fitted. We are hoping to sheet the carriage down making allowance to complete the unfinished work without too many problems. The latest pictures are shown below. Hope fully there will be some updated ones in the next few days so please look back again soon. Roof support fitting underway Partition trial fitted. Some small fettling required Half of the repaired roof beam.

Here we go................19/05/2022

Image
Today we eagerly started work on the assembly of our kit of parts for section 3. All in all a good day with most of it going together without too many problems and paying dividends of the trial fitting in our joinery shop. The pictures below show the Before (top 2) and After (bottom 2) situation with good  progress to report but with plenty more to achieve over the next few weeks. Our thanks go to all involved in the recent big shunt at Williton.  Please check back regularly for all the updated news.  

Views from the waiting room 30/04/2022

Image
 Although we are patiently awaiting our visit to the shed to complete the construction of section 3 our time in the 'waiting area' has not been wasted. The recent settled and dry weather has meant that flooring for the new section has been almost completed and preparation of the two vestibule partitions have been prepared for replacement of the rotted timbers which should commence soon, and hopefully be completed in time to be assembled along with the vestibule framework in a few weeks time. Preparation for dismantling of most of the remaining original bodywork has also been undertaken after a big clear out of the luggage end. The pictures show the internal side of the roof which has seen the light of day for the first time in almost 100 years. The black circular marks seen is the accumulation of almost a century of nicotine drawn through the ventilators. Also shown are the GWR makers template marks. If anyone is interested in purchasing this one please get in touch as although...

07/04/2022 Easier with some floor to stand on................

Image
Whilst we await our slightly overdue arrival in the shed we have been making the most of the sunny, if blustery weather to fit some of the flooring on to the newly assembled section base. A layer of 20mm tongue and groove is topped be 25mm plywood. The lower picture show the first section of ply being eased into place in lateral seating bay 3 and the under floorboards almost completed in the longitudinal seating bay adjacent to the entry vestibule. We're pleased with the progress after one or two minor hiccups to start. Watch out for more progress soon.  

This time we know its for real! 24/03/2022

Image
 Yesterday we went through the final checking and trial fits, today we assembled the main frame of section on the chassis for real. After an early (for us) start we cleared the required space and one of the original vestibule partitions that lay in the way and set about joining the first of the next section sole (bottom) plates in place, soon to be followed by the cross members which have to be assembled prior to the second sole plate to locate it all into the correct position. This is where the earlier trials then pay off and with very little repositioning it all slotted neatly into place. The pictures below show  the assembly in various stages of completion with the final shot showing the corner flooring brackets being added. Al in all a good start to the next few weeks of fairly intense construction work. Please keep checking back for the latest updates or bookmark  G.W.R. Autotrailer 169 News and Restoration Blog (gwrautotrailer169.blogspot.com) .

Final Preparation work section 3, 23/03/2022

Image
 Today we completed the final preparation work and trial assembly of section 3 ahead of the real and hopefully permanent thing starting in earnest tomorrow. The first work will be carried our in the yard at Williton due to overrunning work in the shed. Sawing the flooring rebates Just about ready for final assembly Thankfully the weather looks set fair for a few days. You may be able to catch a glimpse of our work on WSR.org via the Williton webcam. Otherwise check beck here for regular updates over the next few weeks.